Making Waves at our April First Friday
12Apr

12 April 2019

Making Waves at our April First Friday

Station Square Coventry

CV1 2FL

We’ll be taking a look around the Wave,  a new £36.7 million waterpark and leisure centre opening in stages during the Spring and early summer.

Featuring a four lane 25 metre swimming pool with rides and slides alongside a new leisure centre offering an extensive range of facilities, there will be much to see and hear about.

We will meet in Friargate for a talk covering the background to the project and following lunch, will head over to the Wave for a guided tour around the construction site.

Click here to book your place.

Back to List